Courses Offered: SCJP SCWCD Design patterns EJB CORE JAVA AJAX Adv. Java XML STRUTS Web services SPRING HIBERNATE  

       

MANUAL TESTING Course Details
 

Batch Date: Dec 22nd @ 6:00PM

Faculty: Mr. Sunil

Duration: 25 days

Location : S.R Nagar, Hyderabad.

Fee: 1500 INR+ Reg 100 INR

Venue :
Canara bank building 2nd floor,
near S. R Nagar Ploce Station,
Hyderabad-500038.
Contact no: 80 96 96 96 96.


Syllabus:

INTRODUCTION TO SOFTWARE TESTING

  • Introduction to software Testing
  • Testing Principals
  • Objectives of Testing
  • Cost of fixing defects
  • Software Development Process
  • Project vs. Product
  • Error / Bug / Defect
  • Why Software has defects
  • Most common defects
  • Verification vs Validation
  • Difference between QA & QC
  • Role of a Tester

SOFTWARE DEVELOPMENT LIFE CYCLE {SDLC}

  SDLC Phases

SOFTWARE DEVELOPMENT LIFE CYCLE MODELS

  • Waterfall Model
  • Prototype Model
  • V Model
  • Spiral Model
  • Agile Model
  • How to Identify a suitable model for a project

SOFTWARE TESTING METHODOLOGIES

  • White Box Testing
  • Black Box Testing
  • Gray Box Testing

STATIC TESTING TECHNIQUES

  • Reviews
  • Types of Reviews
  • Inspections & Audits
  • Walkthroughs

WHITE BOX TESTING

  • Unit Testing
  • Mutation Testing
  • Integration Testing
  • Big-bang approach
  • Top-down approach
  • Bottom-up approach
  • Stubs & Drivers

DEFECT / BUG LIFE CYCLE & DEFECT MANAGEMENT

  • When New Issue is assigned to Development
  • If the Issue and Steps are clear to reproduce the issue
  • If the Issue and Steps are NOT clear
  • When Issue is fixed by Developer and ready for Alpha Release
  • When it’s Time for Alpha Release
  • In case of Existing Issue – Assigned To Development
  • If the Issue is Not a Bug
  • Build Format
  • Testers/Developers
  • Production
  • Difference between Severity/Priority

BLACK BOX TESTING

   System Testing

USER ACCEPTANCE TESTING (UAT)

  • Alpha Testing
  • Beta Testing

SOFTWARE TESTING TEST PLAN

   Test Plan & Test Strategy

  • Reference Documents
  • Code Freeze Date
  • Change Control
  • Release Criteria
  • Test Items
  • New Product Features to Be Tested
  • Features Excluded from testing
  • Roles and responsibilities
  • Test Matrix
  • Risks and contingencies
  • Test Schedule/Estimates
  • Hardware/Software
  • Test Deliverables

Test Scenarios

Designing

BLACK BOX TEST DESIGN TECHNIQUES

  • ECP
  • BVA
  • Error Guessing
  • Real Time Template for Test case Design
  • Guide Lines for writing Test Cases
  • Difference between strategy and methodology

REQUIREMENT TRACEABILITY MATRIX

   RTM

TEST EXECUTION & TYPES OF TESTING

  • Smoke Testing
  • Sanity Testing
  • Integration Testing
  • Ad-hoc Testing
  • Re-Testing
  • Regression Testing
  • Recovery Testing
  • Risk Based Testing
  • End-to-End Testing
  • Exploratory Testing
  • Monkey Testing
  • UI Testing
  • Usability Testing
  • Security Testing
  • Performance Testing
  • Load Testing
  • Stress Testing
  • Volume Testing
  • Compatibility Testing
  • Configuration Testing
  • Installation Testing
  • Globalization Testing
  • Localization Testing
  • Acceptance Testing
  • Concurrent Testing
  • Parallel Testing

CHECK LIST

  • Software_Testing_Checklist
  • Testing_Project_Setup_Checklist
  • Website_Testing_Checklist

ADDITIONAL ACTIVITIES

  • Testing Opportunities
  • Development Process
  • Testing Process
  • Code Freeze Date
  • Communication b/w developer and tester
  • Guidelines for Writing Text Messages
  • Build Release process
  • Test Case Thinking Process
  • Positive Test Cases
  • Negative Test Cases
  • Testing Certifications
  • Interview Questions